Hayward Base Station AQL2-BASE-RF required if using AQL2-SS-RF
The AQL2-BASE-RF base station must be installed if the AQL2-SS-RF or AQL2-POD will be used. To installthe base station, remove the knockout on the upper left side of the OnCommand main control unit, insert the basestation, and then tighten the nut from the inside.Included with ONCOM-ACT-RC
Sheryl Ghidotti (verified owner) –
Overall experience was very good. Item was easy to find on the website and the price was good. I do wish there were more options on delivery and price.